City of Sachse Murphy Road Reconstruction 

After

Before

Managed the Phase I and Phase II reconstruction of one mile of Murphy Road in Sachse, TX. The firm was the prime consultant responsible for leading and managing the development of the preliminary design for the roadway widening from two undivided lanes to five lanes. The scope of work included paving as well as drainage and culvert design. MVE completed the final roadway and drainage design for the entire $4.8 million project.